Trusted by the firms building tomorrow
Every document. Every revision. Found in seconds.
RE: RE: RE: Structural Steel Submittals — Rev D?
FW: Mechanical Shop Drawings — which version?
RE: RFI-0142 — still waiting on arch response
RE: RE: Curtainwall submittal — superseded??
FW: Change Order #28 — need current specs
RE: Punch list item #347 — still open
"Which Rev is current? I have 3 different PDFs in my Downloads folder."

Rev B sitting in a rain-warped set on the trailer desk.
Rev D was issued 6 weeks ago.
of RFI delays trace to version confusion
Source: AGC Field Survey 2025
Every document tagged on upload
AI reads spec section, trade, revision number, and approval status — automatically.

Automatic revision comparison with redline overlays
Diff between any two revisions in one click
to retrieve any approved shop drawing
"structural steel shop drawing Rev C"
Try the search.
Right now.
Type a document name, spec section, RFI number, or revision — and watch Submittal surface the exact record in under half a second.
Try searching for:
Start typing to search 1,847 project documents

Every revision, every stamp, forever
Complete immutable version history. Pull the approved Rev C shop drawing from 18 months ago in under 10 seconds — with full audit trail.
Embed plate conflict at grid C-4
Slab penetration for MEP coordination
Curtainwall anchor embed tolerance
Roof drain overflow scupper location
Avg. response time: 2.1 days
Universal Search
Full-text across every document, annotation, and approval note.
docs indexed
CO log that closes itself
Links COs to the original spec item and affected submittals automatically.
From inspection to closeout
Field-captured punch items with photo evidence, linked spec section, and sub assignment.
Heard on the jobsite.
From superintendents to owners' reps — the people who live in the documents.
“I pulled the approved curtainwall shop drawing from 14 months ago during the OAC meeting — while the architect was still looking in their email. That moment sold our whole team.”

Marcus Chen
Senior Project Engineer · Turner Construction
“We were juggling 12 subcontractor submittals before Thursday's OAC. Submittal gave our superintendent a single screen to clear approvals. We cut our review cycle from 8 days to 3.”

Priya Nair
Project Manager · Hensel Phelps
“As an owner's rep, I'm on six projects simultaneously. The audit trail alone is worth the subscription — I can show the owner exactly when each document was approved and by whom.”

David Okonkwo
Owner's Representative · Arcadis
Get it on your jobsite.
Every approved drawing, RFI response, and change order — searchable from the trailer or the 30th floor. Download the app or start in your browser.
Try the Web App Free — no install neededScan to download
Point your phone at this from a colleague's screen
SOC 2 Type II certified. All documents encrypted at rest and in transit. 99.97% uptime SLA.